ARMY DEPOT UPGRADE
PROJECT
ATSC
completed a Turn Key project. The work was a combination of new building construction,
upgrade of existing (five) buildings and designed, delivered,
installed all electro mechanical systems, and conducted training in
USA and overseas.
VAT LINES
Waste Water Treatment
Facility
Below is a brief outline of the various
tasks contained within this program.
-
Photometry Lab
-
Welding Shop
-
Electrical Repair Shop
-
Washing and Painting
-
Heat Treatment Shop
-
Metallurgical Laboratory
-
Material Handling
Equipment
-
Heavy and Light Wash Vats
Equipment
-
Chrome and Phosphate Vat
lines
-
Inspection and Crack
Detection
-
Technical Department
Equipment
-
Die Cast Machine for
Aluminum
-
Cast Iron / Cast Steel Shop
Foundry
-
Activation of the
Facility
-
ILS
-
Supplied spare parts and consumables of spares
CHILLERS PAINT
BOOTH VAT
LINES 1 VAT LINES 2